Hidden defects after buying an apartment: what to do before repairs

Hidden defects after a Bulgarian property purchase: preserve evidence, notify the seller and distinguish sale remedies from construction warranties.

Kalchev Law FirmA law firm publication
2 min readPublished: Legal review pending

The essentials

  • Document the problem and notify the seller promptly.
  • Use an appropriate specialist to establish the cause.
  • Distinguish sale liability from construction guarantees and obligations under works contracts.

After the first heavy rain, your recently purchased apartment leaks. Or an installation problem becomes apparent only after you move in. The useful first response is to limit further damage, preserve evidence and notify the seller, rather than rely solely on a verbal promise to repair.

Not every fault makes the seller liable. Its nature, cause and timing matter, along with what was known and agreed at the sale.

The rules on defects

Article 193 of the Obligations and Contracts Act addresses defects substantially reducing value or fitness for ordinary or agreed use. A seller may be liable even without knowing of the defect. The position differs where the buyer knew about it when purchasing.

Article 194 requires inspection after receipt and immediate notification of discovered defects. For a hidden problem not discoverable through an ordinary inspection, prompt notification on discovery also matters. There is an exception where the seller knew, but relying on a future dispute about knowledge is no reason to postpone notice.

Preserve useful evidence

Take dated photographs and video. Record when the problem appeared, how it manifests and which areas it affects. Retain the listing, correspondence, handover record and documents for works carried out.

Notify the seller in writing through a method that can establish receipt. Arrange a technical inspection. The cause may lie in a common part, a neighbouring property or a later event, affecting the appropriate defendant and legal basis.

During an emergency, do not allow avoidable damage merely to preserve an unchanged scene. Document urgent work, retain invoices and preserve evidence of the cause where possible. A significant dispute may justify an application to preserve evidence through the court.

Possible remedies

Subject to the legal requirements, Article 195 provides options including a price reduction, remedying defects at the seller's expense, or returning the property against repayment of the price and sale expenses. The procedure for exercising a remedy concerning real estate requires specific assessment.

This does not mean that any chosen repair quotation will automatically be payable by the seller. Necessity, causation, evidence and the amount all matter.

Do not confuse the time limits

Article 197 establishes a one-year period for Article 195 claims concerning real estate, running from delivery, and three years for a knowingly concealed defect; contractual adjustment of the period is permitted. This is not a universal limit for every claim relating to construction.

Works-contract obligations and construction guarantees may raise separate questions. Liability is not determined simply by describing the apartment as new.

Practical guidance

What to do, step by step

01 / 05

Limit the damage and document immediately

The first response should protect both the property and the evidence.

  • Take dated photographs and video and record when and how the problem appeared.
  • In an emergency, take reasonable urgent steps rather than allowing avoidable damage to increase.
  • Keep invoices, replaced components and other evidence of the cause where possible.
02 / 05

Notify the seller in a provable way

For a hidden defect, discovery and prompt notification may matter.

  • Send written notice through a method that allows receipt to be proved.
  • Describe the specific problem, discovery date and assistance requested.
  • Do not rely only on a verbal promise that someone will come and repair it.
03 / 05

Establish the technical cause

Not every fault is a defect for which the seller is the correct liable party.

  • Arrange an inspection by an appropriate technical specialist.
  • Check whether the cause lies in the apartment, a common part, a neighbouring property or a later intervention.
  • Preserve the listing, handover record, correspondence and documents for works carried out.
04 / 05

Choose the remedy from the evidence

The law provides different remedies, each with its own requirements and procedure.

  • Assess whether the evidence supports a price reduction, remedy at the seller’s expense or another applicable remedy.
  • Do not assume every repair quotation will automatically be reimbursed.
  • For a significant dispute, consider preserving evidence through the court before major repair work.
05 / 05

Check the correct time limit and legal basis

Sale liability, works contracts and construction guarantees can create different claims.

  • Record the handover date and the date the defect was discovered.
  • Check the time limit applicable to the particular legal basis rather than using one universal deadline.
  • Distinguish a claim against the seller from possible rights against a developer, contractor or another party.

Review hidden-defect claims

Discuss your circumstances with a lawyer. Leave a phone number or email, or call us directly.

This article is for general information only. It does not constitute or replace individual legal advice.