An apartment with Act 15 but no “Act 16”: can you move in?

Act 15, keys and a title deed do not replace commissioning in Bulgaria. Check the required use document before moving into a new apartment.

Kalchev Law FirmA law firm publication
2 min readPublished: Legal review pending

The essentials

  • Act 15 is not permission to use the building.
  • The final document depends on the construction category.
  • Keys and a title deed do not replace the required commissioning procedure.

If a Bulgarian building requires commissioning and that procedure is incomplete, Act 15 alone does not authorise residential occupation. Article 178 of the Spatial Development Act prohibits use of such construction works or parts of them before commissioning.

The practical question is not simply whether there is an Act 16. Establish which document is required for the particular building, whether it has been issued and what it covers.

The documents are not interchangeable

Act 15 records fitness for acceptance of the construction works. It forms part of the completion documentation but is not the administrative authorisation for use.

For first-, second- and third-category construction, a use permit is issued by the National Construction Control Directorate. Protocol Form 16 is a basis for that process, not a universal name for every final commissioning document.

Fourth- and fifth-category construction is commissioned through a certificate issued by the authority that granted the construction permit. Listings may use Act 16 informally for different documents. Legal due diligence should identify the actual category and documentation.

What to request

Ask for the construction permit, available Act 15 and commissioning document if one is said to exist. Compare the address, identification, building and phase covered. A document for a neighbouring block or separate phase does not automatically establish the status of your apartment.

Verify issuance through the competent authority or applicable register. If the process is ongoing, ask what has actually been submitted and what remains outstanding. The seller's forecast is not an administrative decision.

What the keys and title deed establish

Transfer of ownership, delivery of possession and authorised use are distinct issues. The possibility of obtaining a title deed does not itself establish that occupation is permitted. Electricity and water supplies do not replace the required authorisation either.

Before final payment, identify the contractual trigger: Act 15, commissioning, handover or another event. Do not assume that you can unilaterally replace the agreed sequence.

If you are invited to move in while waiting for documents

Seek an independent status check and review the contractual obligations. Clarify expenses, temporary infrastructure arrangements, remaining works and liability for delay. If you already signed, the agreement affects the available response.

A legal check is separate from a technical inspection of quality and safety, which may require a construction engineer or another appropriate specialist.

Practical guidance

What to do, step by step

01 / 05

Identify the construction category and required final document

Do not ask only whether there is an Act 16; first determine which document applies to the particular building.

  • Ask for the construction permit and information establishing the construction category.
  • Distinguish a use permit from a commissioning certificate.
  • Do not use the informal expression “Act 16” as a substitute for the actual administrative document.
02 / 05

Check what Act 15 actually establishes

Act 15 is an important stage but is not itself authorisation to use the building.

  • Review the available Act 15 and its scope.
  • Compare the address, block, phase and identification with your specific property.
  • Do not treat a document for another block or phase as proof for your apartment.
03 / 05

Verify commissioning with the competent authority

A seller’s forecast is not an administrative act.

  • Ask for the final document if the seller says the procedure is complete.
  • Confirm issuance through the competent authority or applicable register.
  • If the procedure is still underway, identify what has actually been filed and what remains outstanding.
04 / 05

Connect payments to the contractual milestones

Ownership, possession and authorised use are separate questions.

  • Check whether the next instalment depends on Act 15, commissioning, handover or another event.
  • Do not treat keys, electricity or water as a substitute for the required administrative authorisation.
  • Do not unilaterally change the agreed sequence without legal assessment.
05 / 05

Keep legal and technical checks separate

The documents alone do not establish workmanship or safety.

  • If invited to move in before completion of the procedure, obtain an independent legal status check.
  • Clarify temporary infrastructure, outstanding works, costs and liability for delay.
  • Use an appropriate technical specialist for quality, defects and safety.

Review a new-build purchase

Discuss your circumstances with a lawyer. Leave a phone number or email, or call us directly.

This article is for general information only. It does not constitute or replace individual legal advice.