Changing an approved design during construction

When changes during Bulgarian construction are material departures and why the design and permit must be addressed before carrying them out.

Kalchev Law FirmA law firm publication
1 min readPublished: Legal review pending

The essentials

  • A small change is not necessarily non-material.
  • Permissible material changes require prior approval.
  • A contract amendment does not replace design approval and the administrative act.

A change during construction is not authorised merely by an amendment between buyer and contractor. Determine whether it is a non-material departure or one of the material departures under Article 154 of the Spatial Development Act, and which procedure is available.

Classifying the change

The Act expressly addresses changes to structure and loads, use, common parts and shared installations. A small area or low price does not make a change non-material. Moving a wall may affect the structure; moving a bathroom may affect common installations.

Departures violating the detailed plan, protective regimes, territorial use or construction standards are inadmissible under Article 154(4). For the changes listed in paragraph 2, points 5–8, the Act permits an approved design and an order supplementing the permit, with the necessary consents, before implementation.

Align the contract with approval

Specify the proposed change, who prepares the documents and what happens if approval is refused. Area, common parts, price and the subject of the future conveyance may be affected and need coordinated treatment.

Do not assume every departure can later be documented through as-built drawings. A supplementary order does not restart commencement or completion periods. An already implemented material change requires separate assessment of control consequences, rather than backdated paperwork.

Practical guidance

What to do, step by step

01 / 03

Describe the change

Technical classification should precede works.

  • Compare the proposal with the approved design.
  • Obtain input from the relevant designers.
02 / 03

Check the procedure

Different departures have different admissibility rules.

  • Identify required consents and design documents.
  • Arrange permit supplementation before works.
03 / 03

Align the contract

Address refusal as well as approval.

  • Record resulting price, area and timing changes.
  • Check the future unit’s consistency with title documents.

Discuss this legal issue with our firm

Discuss your circumstances with a lawyer. Leave a phone number or email, or call us directly.

This article is for general information only. It does not constitute or replace individual legal advice.