An order to repair a dangerous building: what should the owner check?

A dangerous-building order in Bulgaria: technical findings, repair versus removal, compliance periods and the owner’s costs.

Kalchev Law FirmA law firm publication
1 min readPublished: Legal review pending

The essentials

  • The order needs specific technical findings.
  • Repair, strengthening and removal have different scopes.
  • Non-compliance may lead to municipal cost recovery.

An owner must maintain a building in a safe technical condition. Where danger exists, the municipality may order repair, strengthening or, under the statutory conditions, removal. A disagreement between co-owners over payment does not eliminate these administrative obligations.

Check the technical basis

Under Article 196 of the Spatial Development Act, a commission appointed by the mayor establishes the condition and necessary works. Obtain its report, photographs, expert material and records of hearing interested parties. For removal under Article 195(6), whether the dangerous building can be repaired or strengthened is material; calling it an “old house” does not answer that question.

Identify the exact requirements

Check the addressee, structure, works and deadline. An order to repair a façade does not authorise unrestricted alterations. Required construction documents and safe organisation of works need separate review.

The order may be challenged under Article 215. Immediate danger can lead to preliminary enforcement, requiring separate assessment. Do not assume filing an appeal permits disregard of every safety measure.

Failure to comply

The Act allows the municipality to carry out works under the prescribed procedure and recover the costs. Allocation between owners is a separate issue. Immovable cultural heritage follows the special Cultural Heritage Act regime, which should be identified at the first review.

Practical guidance

What to do, step by step

01 / 03

Obtain the findings

Do not assess the order from its summary alone.

  • Request the commission’s report.
  • Consider an independent technical assessment if disputed.
02 / 03

Track the periods

Coordinate remedies with safety measures.

  • Keep service evidence and the compliance deadline.
  • Check preliminary enforcement and appeal requirements.
03 / 03

Plan compliance

The works must be lawful and safe.

  • Clarify permits and contractor arrangements.
  • Document costs and relations between co-owners.

Discuss this legal issue with our firm

Discuss your circumstances with a lawyer. Leave a phone number or email, or call us directly.

This article is for general information only. It does not constitute or replace individual legal advice.